General documentation for acceptance work Special moment in the life of module 1.35 (but mostly for the team in 154!) (Aug-5-2004): Report on anomalous spectra with high tails: · From module 1.34 with EDX and SEM reports · From module 1.35: report and spectra after exposure to MGM X-ray · June 15: report on module 1.35 after exposure to LHC level X-ray · June 23: report on S/A analysis for type 1 and type 2 modules Quality procedure document: ATL-IT-QP-0104 pdf format or framemaker version 11 (4 March 2004) Detailed results from HV conditioning: # trips, leakage currents: batch modules test dates combined statistics on all HV conditioned modules batch # 1 1.03 1.17 2.03 2.05 3.01 3.05 18-Sep-03 16-Oct-03 Presentation made by the Hampton group on March 4, 2004 on gain mapping criteria HV pads, straw numbers, stamps and sockets · Spreadsheet with wire list and stamp numbers (ATL-IT-EN-0043) HV monitoring: Information on the HV monitoring and conditioning Labview programs and CAEN SY1527 and SY2527 power supplies operation manual Leak test: 1. description of the data logging program for station #1 2. Documentation for leak test station #2 3. In the Leak test\Leak data folder, copy the new data to data.log 4. To extract the leak rate, go to Leak test\ logger\linfit and read the instructions Data logger for module shipments: quick manual Pictures of lab in building 154: Information from the data logger for module shipments return to the main acceptance test page
|